Saturday, May 07, 2005

GEORGE MADE THIS SKETCH WHICH
SHOWS THE DRILL PIPE 50' BELOW

THE BOTTOM OF COOS BAY CHANNEL
This is a closeup of the two drill sites. Henkle McCoy was set up for 5 months at Site One and had lots of problems. Mead Const. set up at Site Two and punched the sewer line across in only one month. Posted by Hello

0 Comments:

Post a Comment

<< Home